Publications
- Trench Shoring Systems or Trench Formwork. What Is the Correct Term?
- Correct Selection of Temporary Trench Shoring Systems:
Case Studies from the Poznań Metropolitan Area - Correct Selection of Shoring Systems for Temporary Excavations
- Experimental evaluation of the size and distribution of lateral
pressure on the walls of the excavation support
Articles
- Do’s and don’ts of using modular trench shoring systems
- Applications of Kopras modular shoring panels
- Correct selection of temporary trench shoring systems
- Safety of works performed in earth excavations
- Case study: Temporary trench shoring in an active production hall
- Selecting temporary trench shoring
- Shoring selection errors as a cause of trench failure
- Why is employee training in trench shoring so critical?
- Safe trench shoring
- Correct shoring selection – 3.5 x 3.7 m trench box
- Award medal for Kopras
- Slide rail shoring systems
- Cost-effective shoring systems to purchase
- Trade fairs – an overview of top products
- ISO 9001:2009 at Kopras
- Universal point-and-line shoring system
- “Eagle of Polish Construction 2008” Award
- Safe trench shoring
- Technical and economic aspects of correct shoring selection for vertical trench walls
- Trench shoring selection errors: A specific case study analysis